Showing posts with label subway tile. Show all posts
Showing posts with label subway tile. Show all posts

Saturday, August 9, 2008

The 4-letter "D" word

The last two remaining items in the bathroom - now that I've hung the Restoration Hardware towel bars - are to remove the old towel bars, do the requisite wall repair & paint touch-up, and paint the trim.

I found a little time to do everything but the trim paint last weekend.

Thanks for the action photo sweetie! I particularly like how it makes me look like Quasimoto!

But perhaps none of us are looking our best when doing home improvement tasks. I give you Martin in the Bunny Suit as an example.


Since everything's complete except the trim paint, I've declared the bathroom Done. I don't have that all-important fisheye lens that could capture the entire room in one shot, so I will present the finished product from multiple angles:

Sunday, July 27, 2008

It's Over

The Tiling is Done. Caulked, too.


Will I ever, ever, EVER use chair rail again on a wall with an outside corner like this? Why no. No, I won't.

The wall doesn't meet at a 90 degree angle, you see, so my Tiling Toy doesn't work.

I destroyed 3 pieces of chair rail trying to get this aligned correctly, and finally settled for "good enough" rather than perfect.

Next up: towel bars, wall repair, and paint.

Saturday, July 19, 2008

Going the Distance

After weeks of working in Portland, the Project List has been suffering from extreme neglect while my weekends are spent on laundry, repacking, and catching up on the rest of my day job that I didn't get done because I was doing my day job.

Which leads to lack of progress, and of course lack of blog entries about progress.

Since I've officially returned - well, except for that little matter of Detroit next week and Chicago in August - progress can continue.

And I've decided to Go the Distance.

I didn't count on running out of pencil liner. Argh. So close.



Sunday, June 15, 2008

A New Tiling Toy

The one remaining tile-free wall in the bathroom has a small challenge, and I have been happily In Denial about it for some time now.

It's the dreaded Wall Jog.

The last wall juts outward about 3", presumably to cover up the vent stack for the plumbing. And I am tiling it.

So.....How exactly am I doing this?

The cove base, pencil liner, and chair rail obviously all have to have a mitered corner at the Wall Jog. But what about the subway tile? I seemed to have only two reasonable choices - 1) order bullnose subway tile with the bullnose on the 3" side, or 2) miter the subway tile.

I'm chosen option #2, because I think it will look better to be consistent up the wall, rather than the miter, 15 bullnose, 2 miter program which would result from option #1.

Up until this point, I have been mitering my corners by carefully holding up the tile at an approximately 45 degree angle on my Super Burly MK Diamond Tile Saw, and hoping that I emerge from the experience with enough digits to continue to be able to deliver appropriate hand gestures in all circumstances.

I'm not up for that for 18 miters in a row.

So I broke down and ordered the MK Diamond Miter attachment, which conveniently showed up at the same time as my Cathedral Baseboard vent, putting me back in Tiling Business for the weekend.


And a lovely weekend it was, too.


Wednesday, June 4, 2008

Registering the Finishing Touches

With basically only one wall left to tile, I can’t help but notice that I am behind in my Shopping. And we know how much I love Home improvement Shopping. It’s right up there with shopping for shoes for my size 10 feet.

I still have a few hardware items left to procure – towel bars, a replacement doorknob, and a heat register. The most pressing item is the heat register, required to complete the cove base on the remaining wall.

What’s wrong with the existing register?


Does the picture explain everything, or do I need to spell it out?


It can’t possibly be original. It’s flimsy, ugly, has suspicious mildew-looking spots on it, and these are its good qualities.

It does not belong in my rapidly improving bathroom. Nor do its equally ugly cousins belong in the rest of my house, but that’s not currently on the to-do list, or in the budget (budget? What Budget? Oh, the one we blew through months ago….).

There aren’t a lot of options in period-appropriate wall registers in the appropriate size. I could get several different models of adequate and inoffensive floor registers and punch screw holes in them with my Makita, such as these registers from the Hardware Hut in the $50 range.
There are only a few Actual Wall Registers that I could buy, and all are in the three figure range (see lack of budget, above). The Hamilton Strathmore below, also at the Hardware Hut, is lovely, but a bit daunting at $105. Even more daunting is the Rejuvenation model at $132.
And then there are the baseboard registers. Mission Metalworks makes both a grid and cathedral-style register which seem appropriate, and are available from Shop4Classics.com at a much more palatable $65. I like the Cathedral-style.

The real question is which is more authentic to a 1930 frame tudor, the baseboard register, or the metal louvered floor-or-wall type ?

My guess is that it’s probably the baseboard type. That’s what was in my last brick Tudor-esque house. You remember that one. It was DONE.

But to be sure, I thought I should do a little research. Google turned up nothing. I suppose there might be a book somewhere with this kind of detail, but I’m in a hurry.

Where else to check? Why Windermere.com, of course! I requested a search of all houses in Seattle built between 1929 and 1935, and scanned the pictures of Tudor style houses listed for sale.
In general, I was quite hindered in my progress by Realtor pictures which completely obscured the source of heating. Why weren’t they thinking of my needs here?!

Of those that showed the heating, by far the biggest number appear to have the baseboard style register. Some have the floor registers, and just a few use radiators.

This is a bit of a relief, actually, because it was looking challenging to find a chrome wall register to match my faucets, and we all know that white goes with everything.
So the baseboard cathedral-style register it is.....and I'm going to have to wait for it. Progress will stall yet again.

Oh? You say you want the picture now that the sink's head has been surgically reattached?

Here you go. But it's with the old camera; can't get a good zoom out on this one. Sorry.

Sunday, June 1, 2008

Another Sunday Tile-A-Thon

The closer the bathroom gets to functional, the further the camera gets from it. In this case, the battery seems to have stopped charging. I can take pictures, but only as long as the camera is plugged in.

So today's progress photo features a close-up of our Kodak's power cord. Sorry.

What's with the two missing tiles? I hear you ask. Well, as you might recall, there was no possible tile formation that would possibly line up with my walls, and I'm paying the price around the receptacle, since My EE (Martin) informs me that the easiest thing to do is to pull the switches forward and rest them on top of tile. Only....well.....there's no tile to rest the top of the switches on. Nor is there going to be in the current pattern. So the two tiles slots will remain empty until my next Home Depot run, where I will be getting some 6'' x 6'' tiles to cut to size.

Monday, May 26, 2008

Well it's not like it's Picnic Weather

I didn't intend to spend any more time on the Extreme Chaos Project this Memorial Day weekend; there's really no sense of urgency other than my own desire to have a bathroom worthy of using.

But after Martin beheaded the Kohler pedestal sink, I figured, what the hell?

To be clear, we Meant to behead the sink. Just perhaps not this soon, as I don't really have time right now to indulge in lengthy tile-a-thons.

And what do we call this bathroom without the sink? It was clear it was a half bath without the shower. Is it still a half bath without the sink?


Saturday, May 24, 2008

The Tiling Resumes.....

As I mentioned Many Moons ago, I was not going to resume tiling until I had sucessfully managed to create a Baked Good in the privacy of my own kitchen. And I'm pleased to report success with Gluten Free Pantry's Yankee Corn Bread mix, made by Blatantly Disregarding the directions, and instead mixing it with 1/4 cup beet sugar, 1 tbsp honey, 6 tbsp spectrum organic shortening, 7/8 cup rice milk, and Ener-G egg replacer for one egg. I even managed to create something like honey butter using spectrum organic vegetable shortening, imitation butter flavor, a little salt, and of course honey.

Yummy. Stomach full, tiling may continue.

When last we left the Extreme Chaos Project, I had managed to work my way out of the tub enclosure and resume Hygiene Activities (Insert Thanks Here).

In the process, I left highly visible, unsightly walls, as seen below.

After a little quality time with my tile saw and thinset, view the progress:

Sunday, March 16, 2008

Well? What do you think?

Tub enclosure is done.

Of course, there's still the little matter of the rest of the walls. And grout.



Saturday, March 15, 2008

The importance of good communication skills

This is what happens when you and your partner/spouse fail to agree on the appropriate shower tile height in advance of the project.

You get Regress instead of Progress.





Sunday, March 9, 2008

The Road to Hell is Tiled with Good Intentions

....Because paving it would be FASTER. And then how would we spend Eternity?

I had to interrupt this weekend's tile-a-thon for some social events (woohoo! I have a life!), and make one Goat Cheese and Onion Tart, which I will not make again. It was fairly yummy, but the ratio of yumminess to prep time and calories was not really worth it.

But despite the distractions, I almost tiled myself out of the tub enclosure, and had some new fun with Chair Rail.

The last time I did chair rail, I had only one mitered corner to deal with, so I held it in position on the tile saw with my fingers, and I'm still feeling rather lucky that I finished that job with all digits intact.

This time, I have 8 45 degree angle cuts to make, so a cutting guide of some sort seems like a good idea. MK Diamond sells an angle guide attachment for my saw, so for $21, I can make my nice precise cuts. But I am too cheap or too impatient to wait to mail order it, so I've experimented with the $8 carpenter's square. It works surprisingly well, though I'm sure I wouldn't want to do this if I were a Tiling Professional (NOOOOOO!!!!!)

Perhaps another day I will post a close-up of the perfectly angled corner. But for today, be content with the big picture.

What exactly is the point of this product?

I need to put up chair rail, and it seems like having something super sticky - stickier than my normal thinset - would be a good idea. So after a visit to my local Home Despot, I picked up a little tub of Ceramic Tile Adhesive. Very sticky stuff.

After I got it home, I took a closer look at the disclaimer in fine print. It says "Not for use in areas of prolonged water exposure". Now I ask you, what does one usually tile? Oh yes, backSPLASHes and TUB surrounds and SHOWER enclosures. What do those things have in common? Let me think. Oh yes, PROLONGED WATER EXPOSURE.

So what EXACTLY does one tile using ceramic tile adhesive where there ISN'T 'prolonged water exposure?

Sunday, February 24, 2008

The Chair Rail Height Dilemma

As you can see from the "before" photo, the bathroom in its original incarnation had wood trim supporting an inexplicably large quantity of towel bars. In this picture, I'd already removed 2 bath hooks and a towel bar in the interest of not losing an eye while showering, but you can see the residual mounting hardware.


Naturally, I removed trim and towel bars alike prior to beginning this project. Which brought me to my next design struggle. Do I put the Chair Rail at the same height as the former trim, thereby allowing me to skip the wall repair step?

It's quite tempting, but the former trim location is too high, and I'm concerned that the equivalent subway tile wainscot will leave the wall with that fashion-forward look of an old man with his pants hiked up to his armpits.

I think I will just buck up and do the wall repair, and put the trim where I want it.

And this conveniently lets my tiling progress as far as putting up some gratuitous trim today, even though I didn't work as diligently on it as I did yesterday.

Maybe I can even get a bit of chair rail up during the week.

Wednesday, February 20, 2008

Don't Quit Your Day Job

I am fixated on tiling the bathroom with a single mindededness bordering on OCD.


Every day, the piddly three rows of completed subway tile taunt me each time I use our now merely 1/2 bath. The naked, exposed cement board begs me to cover it up: "At least could you put up a shower curtain and give me some Privacy!" says the HardieBacker.

Would anyone notice if I simply slipped out the back door, went home early, and fired up the tile saw? Is OCD a form of illness and should I call in a sick day so I can tile? Throw Caution to the Wind and take a day off?


But as a responsible, hardworking employee, I don't do any of these things. I just wait for Saturday.