Showing posts with label hex tile. Show all posts
Showing posts with label hex tile. Show all posts

Saturday, August 9, 2008

The 4-letter "D" word

The last two remaining items in the bathroom - now that I've hung the Restoration Hardware towel bars - are to remove the old towel bars, do the requisite wall repair & paint touch-up, and paint the trim.

I found a little time to do everything but the trim paint last weekend.

Thanks for the action photo sweetie! I particularly like how it makes me look like Quasimoto!

But perhaps none of us are looking our best when doing home improvement tasks. I give you Martin in the Bunny Suit as an example.


Since everything's complete except the trim paint, I've declared the bathroom Done. I don't have that all-important fisheye lens that could capture the entire room in one shot, so I will present the finished product from multiple angles:

Saturday, July 19, 2008

Going the Distance

After weeks of working in Portland, the Project List has been suffering from extreme neglect while my weekends are spent on laundry, repacking, and catching up on the rest of my day job that I didn't get done because I was doing my day job.

Which leads to lack of progress, and of course lack of blog entries about progress.

Since I've officially returned - well, except for that little matter of Detroit next week and Chicago in August - progress can continue.

And I've decided to Go the Distance.

I didn't count on running out of pencil liner. Argh. So close.



Sunday, June 15, 2008

A New Tiling Toy

The one remaining tile-free wall in the bathroom has a small challenge, and I have been happily In Denial about it for some time now.

It's the dreaded Wall Jog.

The last wall juts outward about 3", presumably to cover up the vent stack for the plumbing. And I am tiling it.

So.....How exactly am I doing this?

The cove base, pencil liner, and chair rail obviously all have to have a mitered corner at the Wall Jog. But what about the subway tile? I seemed to have only two reasonable choices - 1) order bullnose subway tile with the bullnose on the 3" side, or 2) miter the subway tile.

I'm chosen option #2, because I think it will look better to be consistent up the wall, rather than the miter, 15 bullnose, 2 miter program which would result from option #1.

Up until this point, I have been mitering my corners by carefully holding up the tile at an approximately 45 degree angle on my Super Burly MK Diamond Tile Saw, and hoping that I emerge from the experience with enough digits to continue to be able to deliver appropriate hand gestures in all circumstances.

I'm not up for that for 18 miters in a row.

So I broke down and ordered the MK Diamond Miter attachment, which conveniently showed up at the same time as my Cathedral Baseboard vent, putting me back in Tiling Business for the weekend.


And a lovely weekend it was, too.


Thursday, June 12, 2008

Practicing Safe Hex

Before I advance to tiling the last remaining wall, I have a little mandatory hex tile floor patching to do.

You may recall that way back in the distant past (October 2007), I found a "close enough" match to my original Hex tile, which I could use to patch a small corner of the floor to the side of the toilet.

You might also recall, back in March of this year, my drivel about the usefulness of Ceramic Tile Adhesive.

I am just happy that after all this time, I could recall the location of both of these products. It was time to put them to use.
Where are the new tiles? Hint: they are clean. Ought to be a dead giveaway really.


But in case it wasn't obvious.....here are the newbies.